The room by room list, taken while the final payment is still yours to hold.
We have not published a Schofields handover set, because the jobs behind this site are pre-purchase and stage work. Rather than borrow photographs from another suburb we have left the page honest about it. What the inspection covers does not change, and on attached housing it carries one question a freestanding house does not: which side of the lot boundary each item falls on, because that decides who you are actually asking to fix it.

Annotated findings from Pre-handover (PCI) inspections on Schofields builds. Client addresses withheld.
1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, steel and formwork complete
3FrameOnce frame and trusses are up and the roof is on, before lining
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before the painter
6WaterproofingAfter the membrane is applied and before any tile is laidInstant online pricing, or talk to the booking team on 1300 471 805.
Because we have no Schofields handover photography. The completed jobs behind this site are pre-purchase and stage inspections, and borrowing images would let you read them as local.
The developer or the body corporate rather than you, which is precisely why the boundary gets established before the list is written.
On a new build, dozens. The number that tells you something is the split between structural and cosmetic.
It is a separate booking, and on a long list it usually pays for itself in items that would otherwise close quietly.
Two to three weeks ahead, so there is room for the builder to act and room for us to verify.
Please do. On attached housing especially, walking it together makes the boundary question much clearer.