Schofields Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Lock-up inspection in Schofields

Roof on, services in, and the last look at the details that only attached housing has.

  • After roof, cladding and external doors, before plaster
  • 1 to 2 hours on site
  • Report within 24 hours
Price your Schofields inspectionTell us the address and what you need.

Fully licensed & accredited

Stage4 of 7
When to bookAfter roof, cladding and external doors, before plaster
Time on site1 to 2 hours on site
Inspected againstAS 3700 (masonry), AS 4773, AS 2047 (windows), NCC Part 3.5 roof and wall cladding, manufacturer flashing details

What is included in a Schofields lock-up (pre-plaster) inspection

  • Wall wrap and roof sarking coverage, laps and tears
  • Head, sill and jamb flashings to every window and door
  • Weep holes clear and correctly spaced
  • Articulation joints and cavity clearance
  • Mortar joints, brick ties and bed joint reinforcement
  • Lintels over openings and their bearing
  • Roof battens, tile or sheet fixing and ridge details
  • Valleys, penetrations and box gutter supports
  • Roof space insulation, sarking and services
  • Exhaust and rangehood ducting runs
  • External cladding fixing and clearance to ground
  • Garage, porch and alfresco set-downs
  • Site drainage and grading before landscaping
  • Debris and mortar droppings at the slab edge
Why it matters here

Lock-up (pre-plaster) inspections on Schofields builds

This is the Schofields stage that earns its fee, and it earns it on detail that a freestanding house never presents. Damp proof course continuity across the junction between dwellings, recorded twice. Fire rated sealant at service penetrations. Pressure flashings. Joint thickness. Render covering something it should not have. And corrosive paint applied to metal that will sit inside a wall for the life of the building.

What we find at this stage in Schofields

  • Damp proof course not continuous across the junction
  • Fire rated sealant missing at service penetrations
  • Pressure flashing detail incomplete
  • Joint thickness outside the requirement
  • Corrosive paint applied to metal components
Joint thickness at a junction, Schofields
Joint thickness at a junction
Sample findings

Sample defects found during our lock-up (pre-plaster) inspections in Schofields

Annotated findings from Lock-up (pre-plaster) inspections on Schofields builds. Client addresses withheld.

Damp proof course, recorded during a lock-up inspection in Schofields
Damp proof course at the junction
Damp proof course, recorded during a lock-up inspection in Schofields
A second damp proof course record
Fire rated sealant, recorded during a lock-up inspection in Schofields
Fire rated sealant at a penetration
Corrosive paint, recorded during a lock-up inspection in Schofields
Corrosive paint on metal

The other stages of a Schofields build

  1. Bored piers inspection in Schofields1Bored piersAfter boring and cage placement, before concrete
  2. Slab pre-pour inspection in Schofields2Slab pre-pourThe day before the pour, steel and formwork complete
  3. Frame inspection in Schofields3FrameOnce frame and trusses are up and the roof is on, before lining
  4. Fixing inspection in Schofields5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Schofields6WaterproofingAfter the membrane is applied and before any tile is laid
  6. Pre-handover (PCI) inspection in Schofields7Pre-handover (PCI)Two to three weeks before your handover date

All construction stage inspections in Schofields →

Guides

Construction stage guides for Schofields

All guides →

Book a lock-up (pre-plaster) inspection in Schofields

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Lock-up (pre-plaster) inspections in Schofields: common questions

What breaks a damp proof course?

A gap, a lap in the wrong direction, or a section simply not carried across the junction. On attached dwellings that junction is where moisture crosses between properties, so continuity is the whole point.

Why is fire rated sealant singled out?

Because a service penetration through a fire separating wall breaches the separation, and only a rated product reinstates it. Standard sealant is visually identical and provides none of the resistance.

Is corrosive paint a real issue?

On galvanised or coated metal inside a wall, yes. Some coatings react with the substrate and shorten its life, and that element is never inspected again.

Are lock-up and pre-plaster the same?

Yes, one stage under two names, defined by services being complete and linings not.

How long does it take?

Around two hours plus the report, longer where the dwelling is attached and there is more junction detail to reach.

What if plaster has begun?

We assess what remains exposed and record which areas were already closed.

CallGet a Free Quote